Replies: 19
| visibility 305
|
Orange Beast [6532]
TigerPulse: 100%
40
|
|
|
 |
Ultimate Tiger [35079]
TigerPulse: 100%
56
Posts: 14488
Joined: 2014
|
Re: Scoreboard Construction...
Aug 11, 2022, 9:52 AM
|
|
We should all know the dimensions of the new and old boards after reading that.
|
|
|
|
 |
Ultimate Clemson Legend [101299]
TigerPulse: 100%
64
Posts: 48721
Joined: 2009
|
Yep, about twice as wide and..
Aug 11, 2022, 9:58 AM
|
|
about 2 times higher. YiKES!!
|
|
|
|
 |
Gridiron Giant [15445]
TigerPulse: 100%
50
Posts: 10806
Joined: 1999
|
that and....
Aug 11, 2022, 12:28 PM
[ in reply to Re: Scoreboard Construction... ] |
|
The Phase 2 Memorial Stadium project also adds LED lights in the stadium, and stadium signage updates, originally set to cost $68.7 million. The home opener is September 10 at 3:30 pm hosting Furman University.
|
|
|
|
 |
Hall of Famer [9071]
TigerPulse: 100%
43
|
|
|
|
 |
National Champion [8063]
TigerPulse: 100%
42
Posts: 10827
Joined: 2007
|
wonder how much they could auction off Danny's Hat?
Aug 11, 2022, 10:04 AM
|
|
|
|
|
|
|
 |
Heisman Winner [86522]
TigerPulse: 100%
62
Posts: 39118
Joined: 2003
|
Almost $70 Million. That is one expensive TV set. For that
Aug 11, 2022, 10:41 AM
|
|
kind of change, it better come with Alexa already installed, and be fully Bluetooth compatible!
|
|
|
|
 |
Dynasty Maker [3492]
TigerPulse: 100%
34
|
I think that figure included the formerly planned seat
Aug 11, 2022, 11:34 AM
|
|
additions to the east end zone. No revised amount was released after those plans were changed.
|
|
|
|
 |
Rival Killer [2617]
TigerPulse: 90%
33
|
the scoreboard needs to be
Aug 11, 2022, 11:14 AM
|
|
taken down, immediately. It's too big. Can't see the beautiful campus from the stadium. Major mistake of aesthetics.
|
|
|
|
 |
Athletic Dir [1127]
TigerPulse: 95%
26
|
Re: Scoreboard Construction...
Aug 11, 2022, 11:17 AM
|
|
Only problem with the scoreboard pics is that they show a massive error. THE STADIUM WAS NOT DEDICATED IN 1942!!! In the 1942 first game program against PC on page 2 says the stadium will not be dedicated until after the war. In the Sept 29, 1944 TIGER paper there is a story that the stadium was named Memorial stadium BUT the dedication would be delayed until after the war. Similar info was stated in 1949. Bottom line is the stadium has NEVER been dedicated. Don't take my word, check it out yourselves.
|
|
|
|
 |
Dynasty Maker [3492]
TigerPulse: 100%
34
|
I DO NOT like the burnt orange seats in the new club area.***
Aug 11, 2022, 11:32 AM
|
|
|
|
|
|
 |
Heisman Winner [86522]
TigerPulse: 100%
62
Posts: 39118
Joined: 2003
|
I do not like Green Eggs and Ham. I do not like them, Sam
Aug 11, 2022, 1:00 PM
|
|
I am.
|
|
|
|
 |
110%er [3766]
TigerPulse: 100%
35
|
Why is the skin almost see through?
Aug 11, 2022, 11:36 AM
|
|
IS that for heat dissipation?
By the way, it's 125 feet wide by 57 feet tall.
|
|
|
|
 |
Tiger Spirit [9448]
TigerPulse: 100%
44
|
Re: Why is the skin almost see through?
Aug 11, 2022, 11:51 AM
|
|
That’s what I’m wondering. Saw it in person this week and it looks terrible.
|
|
|
|
 |
110%er [3766]
TigerPulse: 100%
35
|
I am sure that it will be dark in the cabinet and you won't
Aug 11, 2022, 12:08 PM
|
|
be able to see anything.
|
|
|
|
 |
Game Changer [1800]
TigerPulse: 100%
31
|
Re: Scoreboard Construction...
Aug 11, 2022, 11:39 AM
|
|
I’m sorry. But did that article say 68.7 mil ?
|
|
|
|
 |
Freshman [-74]
TigerPulse: 66%
-1
|
Important question?
Aug 11, 2022, 11:48 AM
|
|
Will the Tiger with wagging tail be on top?
|
|
|
|
 |
Mascot [19]
TigerPulse: 100%
2
|
Re: Important question?
Aug 11, 2022, 11:50 AM
|
|
Always
|
|
|
|
 |
Paw Warrior [4973]
TigerPulse: 100%
37
|
Re: Scoreboard Construction...
Aug 11, 2022, 12:02 PM
|
|
And they've already messed up the freshly painted paw on the road.
|
|
|
|
 |
110%er [3625]
TigerPulse: 98%
35
|
Re: Scoreboard Construction...
Aug 11, 2022, 1:05 PM
|
|
It will be interesting to see what the remote control looks like.
|
|
|
|
Replies: 19
| visibility 305
|
|
|