Tiger Board Logo

Donor's Den General Leaderboards TNET coins™ POTD Hall of Fame Map FAQ
GIVE AN AWARD
Use your TNET coins™ to grant this post a special award!

W
50
Big Brain
90
Love it!
100
Cheers
100
Helpful
100
Made Me Smile
100
Great Idea!
150
Mind Blown
150
Caring
200
Flammable
200
Hear ye, hear ye
200
Bravo
250
Nom Nom Nom
250
Take My Coins
500
Ooo, Shiny!
700
Treasured Post!
1000

YOUR BALANCE
Weird timing due to the bridge in Maryland, but looks like CHS is
General Boards - The Lounge
add New Topic
Replies: 18
| visibility 151

Weird timing due to the bridge in Maryland, but looks like CHS is

1

Mar 28, 2024, 9:52 AM
Reply

getting a new bridge.

That bridge was broken when it was built and has been coming apart since it was built.

I bet I've replaced at least a half dozen windshields over the years driving over that bridge. I replaced 3 windshields on one SUV from rock chips driving over the Don Holt.

https://abcnews4.com/news/local/south-carolinas-dot-announces-replacement-don-holt-bridge-interstate-526-cargo-shipments-news-abc-news-4-wciv-maryland-baltimore-2024

badge-donor-05yr.jpg flag link military_tech thumb_downthumb_up

A lot of money in infrastructure it seems like. They are also redoing the


Mar 28, 2024, 9:54 AM
Reply

highway 17 bridges going out of Georgetown.

2024 white level memberbadge-donor-05yr.jpg flag link military_tech thumb_downthumb_up

I like your funny words magic man


I've gone over those about 6 times in the last 6 months


Mar 28, 2024, 10:13 AM
Reply

I see where there was work happening, but never anyone actively doing anything.

badge-donor-05yr.jpg flag link military_tech thumb_downthumb_up

Lol. They have somehow managed to screw up the biggest project.

1

Mar 28, 2024, 10:14 AM [ in reply to A lot of money in infrastructure it seems like. They are also redoing the ]
Reply

the $1.6 billion "Carolina Crossroads" project is dead in the water, for a while anyway.

DOT first put the project up for bids after picking a plan from among many proposals. I think they chose the cheapest, go figure. When they put it up for bids at $1.6 billion, NO ONE, not a single company, made a bid for the job. Wonder why?

Anyway, they then split the job into like 4-5 sections, and then put those 4-5 sections up for bids, and they got bidders and signed contracts. They have already started work on two sections of the project, and several bridges have already been built. BUT, the most important section, smack in the middle of malfunction junction, they learned that section would go WAY over budget because the original contract had not taken into account relocating infrastructure in the area. So they have shitcanned the most important section of the project (back to the drawing board), that all other sections tie into, until they can come up with an alternate plan. Again, they ALREADY HAVE BRIDGES BUILT to tie into a section of the project that's been put on hold.

I wish I were making this up. But, I'm not.

Oh, and the I-26 widening project going towards Greenville, the first section is complete, but it's still two lanes. Want to know why? Because DOT asked the contractor to do work outside and beyond the scope of the contract, since they were already in the area. The contractor did the work, over $3 million worth of extra work, and DOT has refused to pay them. So, the contractor is keeping the lanes closed until DOT pays what they owe.

Meanwhile, the state has $1.8 billion sitting in an account and they can't figure out where it came from?

Anyway, I'm beyond done here. I fully retract my Tennessee dig yesterday. Obed®

2024 orange level memberbadge-donor-15yr.jpgringofhonor-tiggity-110.jpg flag link military_tech thumb_downthumb_up


SC DOT is worthless


Mar 28, 2024, 10:28 AM
Reply

30-40 years ago we thought we had the best roads in the country. They looked nice but we find they were actually built poorly.

flag link military_tech thumb_downthumb_up

In fairness to SCDOT this was more due to our gas tax than anything else


Mar 28, 2024, 10:37 AM
Reply

SC spent two decades with some of the lowest gas taxes in the country. Problem is that tax is used to fund roads and infrastructure, and we failed to fund what was necessary for growth.

Meanwhile, decades ago GA and NC raised their gas taxes, and have spent billions more on roads than SC. And drive to NC or GA and you see the results, MUCH better roads. So the state legislature FINALLY decided to raise the tax, to match GA and NC. The gubnah vetoed the tax increase because he knew it would be overridden by the legislature, and it was. So our gas prices match NC and GA now. But our roads are still crap. Why? because for 20 YEARS NC and GA improved their roads with billions of extra dollars from their higher gas tax. Simply matching their gas tax doesn't and won't bring our roads up to par with them, it will simply stop the decline of our roads relative to their roads.

Nope, to have roads and infrastructure to match GA and NC, SC has to either raise our gas tax higher than NC and GA to the extent they were once higher than SC, OR....what we're doing, throw covid money into the pot, and maybe the $1.8 billion we found laying around.

2024 orange level memberbadge-donor-15yr.jpgringofhonor-tiggity-110.jpg flag link military_tech thumb_downthumb_up


You could raise the gas tax to $10 a gallon and it wouldn't solve the

1

Mar 28, 2024, 11:34 AM
Reply

#### poor job SCDOT does.

2024 white level memberbadge-donor-15yr.jpgringofhonor-lakebum1-110.jpg flag link military_tech thumb_downthumb_up

Well, there's that too. But it would take a miracle to catch up to


Mar 28, 2024, 12:49 PM
Reply

NC and GA roads, even with our current tax. But then again $1.8 billion "found" and whatever we have from covid, that's a heck of a lot to add, so there's hope I guess.

2024 orange level memberbadge-donor-15yr.jpgringofhonor-tiggity-110.jpg flag link military_tech thumb_downthumb_up


Re: Lol. They have somehow managed to screw up the biggest project.


Mar 28, 2024, 10:54 AM [ in reply to Lol. They have somehow managed to screw up the biggest project. ]
Reply

"When they put it up for bids at $1.6 billion, NO ONE, not a single company, made a bid for the job. Wonder why?"

The reason they couldn't get bids is because done as one project, it would have taken about 10 years. No contractor is going to bid on a project that long because there's no way to know what material costs will be that far out.

badge-donor-05yr.jpg flag link military_tech thumb_downthumb_up

There's a bridge in the Pee Dee that has been under construction for 2 years


Mar 28, 2024, 12:23 PM [ in reply to Lol. They have somehow managed to screw up the biggest project. ]
Reply

now. Lane changes, cones, everything. 0 workers ever. Once a week they go and change the location of the truck that's out there so it looks like somebody has done something. Never seen a worker.

2024 white level memberbadge-donor-05yr.jpg flag link military_tech thumb_downthumb_up

I like your funny words magic man


SCDOT has been working on some section of I-85 consistently since at least 1986


Mar 28, 2024, 12:52 PM
Reply

I don't recall a time they haven't been working on it.

badge-donor-05yr.jpg flag link military_tech thumb_downthumb_up

Grew up at North CHS and first job out of college was at Westvaco

1

Mar 28, 2024, 10:00 AM
Reply

Feeling a little old.

badge-donor-05yr.jpg flag link military_tech thumb_downthumb_up

FeelOldPost. kthx.


Mar 28, 2024, 10:02 AM
Reply

I'm older than 526 and the Don Holt bridge.

2024 orange level memberbadge-donor-15yr.jpgringofhonor-tiggity-110.jpg flag link military_tech thumb_downthumb_up


They made it about 1/2 as long as the cooper river bridge***


Mar 28, 2024, 10:07 AM
Reply



badge-donor-05yr.jpg flag link military_tech thumb_downthumb_up

Talmadge Bridge will be raised 20 feet higher in the middle.


Mar 28, 2024, 10:26 AM
Reply

Would cost $2 Billion to replace.

2024 purple level memberbadge-donor-15yr.jpgringofhonor-beeksteak-110.jpg flag link military_tech thumb_downthumb_up

The Wando Bridge isn't any better***


Mar 28, 2024, 10:53 AM
Reply



flag link military_tech thumb_downthumb_up

Let's just nuke every bridge going into Charleston and the surrounding areas


Mar 28, 2024, 12:24 PM
Reply

and let the Ohioans have it.

2024 white level memberbadge-donor-05yr.jpg flag link military_tech thumb_downthumb_up

I like your funny words magic man


The north Wando Bridge? I haven't been over it in a while, but its <5 years old


Mar 28, 2024, 12:53 PM [ in reply to The Wando Bridge isn't any better*** ]
Reply

Is it already messed up?

badge-donor-05yr.jpg flag link military_tech thumb_downthumb_up

Re: Weird timing due to the bridge in Maryland, but looks like CHS is


Mar 28, 2024, 4:32 PM
Reply

SPA bought the former paper mill just north of the don holt to expand port operations. The clearance of don holt is 155’. Ravenel clearance is 185’. Don holt needs to be higher for container ships to reach old paper mill site. By the way Savanah is also replacing the Talmadg bridge