CLEMSON FOOTBALL

PHOTO: Construction on West EndZone and Oculus


by - Assoc. Editor -

Photo from 1/30/2015

Photo from 1/6/2015

Photo from 12/11/2014

Clemson athletic director Dan Radakovich spoke on these projects back in October.

"At the end of the football season, we’ll have two projects going on in Memorial Stadium. Number one we’ll be building out the West EndZone with the Oculus feature that was always planned,” Radakovich said. “That feature will have a practical twist to it in that it will have bridge in it that will allow fans from the north stands to traverse very easily to the south end."

This project should be completed before the beginning of the 2015 football season.

Pic description: Night rendering of the West Endzone and Oculus

Ultimate Level LogoUpgrade Your Account

Unlock premium boards and exclusive features (e.g. ad-free) by upgrading your account today.

Upgrade Now
Comment on this story
Print   
Send Feedback to Tony Crumpton: Email | Comment
No. 12 Deacs get to Clemson pitching, clinch series win over No. 2 Tigers
No. 12 Deacs get to Clemson pitching, clinch series win over No. 2 Tigers
Poppie completes coaching staff with hiring of Tulsa assistant
Poppie completes coaching staff with hiring of Tulsa assistant
WATCH: Behind the scenes with Clemson in the NFL draft
WATCH: Behind the scenes with Clemson in the NFL draft
Wake's Burns notches 16 strikeouts, No. 12 Deacs take opener over No. 2 Tigers
Wake's Burns notches 16 strikeouts, No. 12 Deacs take opener over No. 2 Tigers
Post your comments!