Tiger Board Logo

Donor's Den General Leaderboards TNET coins™ POTD Hall of Fame Map FAQ
GIVE AN AWARD
Use your TNET coins™ to grant this post a special award!

W
50
Big Brain
90
Love it!
100
Cheers
100
Helpful
100
Made Me Smile
100
Great Idea!
150
Mind Blown
150
Caring
200
Flammable
200
Hear ye, hear ye
200
Bravo
250
Nom Nom Nom
250
Take My Coins
500
Ooo, Shiny!
700
Treasured Post!
1000

YOUR BALANCE
30 x 40 concrete parking pad
storage This topic has been archived - replies are not allowed.
Archives - Tiger Boards Archive
add New Topic
Replies: 16
| visibility 3,689

30 x 40 concrete parking pad


Apr 2, 2015, 3:19 PM

Any ideas of what that will cost here just outside of Fayetteville NC?

Nothing heavy...pickup, minivan...

TIA in advance

flag link military_tech thumb_downthumb_up

Around $5 or $6 a square foot, so approx. $6k-$7k***


Apr 2, 2015, 3:29 PM



flag link military_tech thumb_downthumb_up

Re: Around $5 or $6 a square foot, so approx. $6k-$7k***


Apr 2, 2015, 3:57 PM

Thanks for the response...thats a lot higher than i was expecting.

Maybe I'll grade and form myself and let someone pour and finish. maybe i can cut some $$

flag link military_tech thumb_downthumb_up

Re: Around $5 or $6 a square foot, so approx. $6k-$7k***


Apr 2, 2015, 4:08 PM

Are u asking for total project cost or just the cost of concrete and delivery?

flag link military_tech thumb_downthumb_up

Re: 30 x 40 concrete parking pad


Apr 2, 2015, 3:31 PM

2500 or 5000 psi 'crete????

flag link military_tech thumb_downthumb_up


Re: 30 x 40 concrete parking pad


Apr 2, 2015, 3:41 PM

You need 5000psi for general parkin and pick up bball games?

flag link military_tech thumb_downthumb_up

Re: 30 x 40 concrete parking pad


Apr 2, 2015, 4:29 PM

NO. I most often see 3,500psi for a 6" slab with #3 rebar in commercial paving/parking.

flag link military_tech thumb_downthumb_up

WWF or #3 @12?


Apr 2, 2015, 4:02 PM [ in reply to Re: 30 x 40 concrete parking pad ]

Subbase material?

2024 white level memberbadge-donor-15yr.jpg flag link military_tech thumb_downthumb_up

"When I was young, I was sure of many things; now there are only two things of which I am sure: one is, that I am a miserable sinner; and the other, that Christ is an all-sufficient Saviour. He is well-taught who learns these two lessons." -John Newton


Re: 30 x 40 concrete parking pad


Apr 2, 2015, 5:26 PM

All you need is a 4" slab with 3,000 psi concrete. Make sure it's on virgin soil or it will settle. Budget $3.50/SF turn-key, unless some significant grading is required. I'm a structural engineer who used to (amongst other things) prepare estimates for a concrete construction company.

flag link military_tech thumb_downthumb_up

Question ...


Apr 2, 2015, 5:53 PM

@bgjohns On an existing garage concrete pad that has settled a few inches and cracked (about 3 inches over 16 years), is it easier / cheaper to break up the old section and pour fresh or to jack up the old piece and fill under it (ram jack or similar procedure) ? The settled section is about 24' x 10' or about 1/3 of the total surface ... and yes, it was built on fill dirt. :(

badge-donor-15yr.jpg flag link military_tech thumb_downthumb_up

Re: Question ...


Apr 2, 2015, 6:33 PM

Tear it up and pour fresh. If you still have concerns about the soil dig the fill out and replace with stone fill.

flag link military_tech thumb_downthumb_up

Bingo


Apr 2, 2015, 6:38 PM

I like to use the bones of conquered foes on Tnet as aggregate fill, it does a great job with drainage and can be picked up for free in the PnR board.

.

badge-donor-10yr.jpg flag link military_tech thumb_downthumb_up

ha, yeah this guy is exactly right


Apr 2, 2015, 9:44 PM [ in reply to Re: 30 x 40 concrete parking pad ]

I'm a structural engineer as well and have specified well over a thousand slabs

2024 orange level memberbadge-donor-10yr.jpg flag link military_tech thumb_downthumb_up


Why are spec builders allowed to pour slabs on fill dirt??


Apr 3, 2015, 9:54 PM

How does that pass inspection?

1/3 of my garage slab has cracked and sunk about 3 inches since we bought the house 16 years ago.

From the topography of the lot, it's pretty obvious that the garage was built on top of fresh fill.

Just venting ...

badge-donor-15yr.jpg flag link military_tech thumb_downthumb_up

Put down welded wire mesh before you pour. It


Apr 2, 2015, 7:41 PM

will pay off and prevent cracking in the future.

flag link military_tech thumb_downthumb_up

It won't if you leave it at the bottom of the pour.


Apr 3, 2015, 7:45 AM

It should be pulled up a little over an inch from the bottom of the slab. If you leave it laying on bottom you might as well leave it out.

2024 orange level memberbadge-donor-10yr.jpgringofhonor-clemsontiger1988-110.jpg flag link military_tech thumb_downthumb_up

Re: 30 x 40 concrete parking pad


Apr 3, 2015, 10:52 PM

MEXICO Cheaper !
Just move.

flag link military_tech thumb_downthumb_up

Replies: 16
| visibility 3,689