PHOTO: Construction on West EndZone and Oculus


by - Assoc. Editor -
    |


Photo from 8/12/2015


Photo from 7/30/2015


Photo from 4/27/2015


Photo from 3/04/2015


Photo from 1/30/2015


Photo from 1/6/2015


Photo from 12/11/2014

Clemson athletic director Dan Radakovich spoke on these projects back in October.

"At the end of the football season, we’ll have two projects going on in Memorial Stadium. Number one we’ll be building out the West EndZone with the Oculus feature that was always planned,” Radakovich said. “That feature will have a practical twist to it in that it will have bridge in it that will allow fans from the north stands to traverse very easily to the south end."

This project should be completed before the beginning of the 2015 football season.

Pic description: Night rendering of the West Endzone and Oculus

Send Feedback to Tony Crumpton: Email | Comment
    |
Loading...
Post your comments!

Inside the Road Trip: Big game vibe was missing from Louisville

Former Clemson LB traded to Dolphins

Don't want to get smacked by Wilkins? Don't score. Or play rock-paper-scissors

ESPN analyst: Bryant 'will be better' than Watson

WATCH: Clemson is a complete football team

Dates set for 2018 Clemson-SC, Clemson-TAMU

Former Clemson WR signs with Roughriders

Wilkins: 'Don't score if you don't want to get me too excited'

WATCH: O'Daniel on his transition into playmaker role
Sign Up for E-Mail News Alerts
Features
Updates
Daily Digest